Tuesday, August 31, 2010

Electric Meter


WE HAVE POWER!!!!!!!!!!!!!!!

Sunday, August 29, 2010

We returned from Michigan (our vacation) on August 10th. I (Marsha) went to work the next day. Russ took care of some business stuff too.

My dad finished watching TiJim on the 20th and stayed with us until the 28th. During the time that dad was here, Russ and dad built the steps up to the house, started the deck, and started the interior walls.

Our electrician came out yesterday, and got the power run from the pole to the main fuse box in the house. Our meter is supposed to arrive tomorrow.

The next problem is the septic system. Russ called for our first inspection. The inspector said that there is a problem with the soil and they now want us to change the design of our original system. There is a tremendous increase in price for either of the two options.

I am attaching photos of the inside, the steps, the deck, the electrical fuse box.